| Specification: | Six ( 6) Steam Turbines, 12 MW and 15 MW with Boilers
Four ( 4) 12 MW and Two ( 2) 15 MW Condensing Steam Turbine
Generator Sets, 50HZ, Three ( 3) 90 ton/ hr coal dust boiler and
Three ( 3) 75 tons CFB Boiler, Year: 1999 and 2000.
Complete Package, Contact us for information. |